Anagama construction and the first firing
Anagama construction
Ground plan
(Under Construction)
#01 Preparation of anagama construction
#02 Preparation of anagama construction
#03 Preparation of anagama construction
#04 Preparation of anagama construction備
#05 Preparation of anagama construction
#06 Basic construction
#07 A helper joins from USA
#08 The foundation of a fire box was finished
#09 Basic structure of the backmost part
#10 The strong foundation(from front)
#11 The strong foundation(from back)
#12 Fire box and grate
#13 Kiln seen from back 1
#14 Kiln seen from back 2
#15 A part of arch
#16 Drain
#17 A part of grate
#18 The model in a fire box
#19 From back side
#20 The model in a chamber
#21 The complete view after model seting
#22 Entrance 1
#23 Entrance 2
#24 Chamber room's almost completed
#25 Fire box
#26 The end brick of chamber
#27 Fire box
#28 From other angle
#29 Inside of the kiln
#30 The detail of backwall
#31 The joint of a flue
#32 Empty room and backwall
#33 The detail of under fire mouth
#34 Anagama was completed
Loading
#01 Loading 1
#02 Loading 2
#03 Loading 3
#04 Loading 4
#05 Loading 5
#06 Loading 6
Firing
#01 6:00 p.m. on April 21
#02 2:00 p.m. on April 22
#03 from 7:00 p.m. on the same day
#04 April 23
#05 April 24
#06 from 2:00 a.m. on April 25
#07 10:00 P.M. on April 26
#08 2:00 P.M. on April 27
#09 2:00 A.M. on April 28
#10 4:00 A.M. on April 29
#11 4:00 A.M. on April 30
Unloading
#01 May 8, 2:00 p.m
#02 May 8, 2:00 p.m --
#03 May 8, 2:00 p.m --
#04 May 8, 2:00 p.m --
#05 May 8, 2:00 p.m --
#06 May 8, 2:00 p.m --
#07 May 8
#08 Link to Mr. Takigawa's page. (only Japanese)
The works from
the first firing
Shiho Kanzaki's works #1
Shiho Kanzaki's works #2
Hironobu Ogawa's works #1
Hironobu Ogawa's works #2
Takusuke Kawasaki
Miyako Nakane
Jeff Jewell